SE2: MB Green Marina
Friday, October 30, 2009
Log 5B (10/26-10/30)
It is the end of the week of 10/26-10/30 and I have arranged all my mentor contacts ready to be handed in however they were not collected. The date has changed to be handed in by the end of the marking period which is by 11/10.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Links
St. Johns Clean Marina Program
NOAA
MAST
Content
Background Info
(1)
Biweekly Logs
(55)
Brainstorming/Alternate Solutions
(1)
Construction Phase Pictures
(2)
Design Brief (Group and Individual)
(1)
Final Newsletter
(1)
Final Solution (Drawn on AutoCAD)
(1)
Limitations
(1)
Plan of Procedures
(1)
Selection/Rejection/Intention Report
(1)
Specifications
(1)
Specifications Grid
(1)
STEMM Report
(1)
Summer Research
(1)
Summer Research (Photos)
(1)
Testing Procedures
(1)
Update
(1)
Blog Archive
▼
2009
(34)
►
September
(10)
▼
October
(9)
Log 1 (9/28-10/2)
Log 2A (10/5-10/9)
Log 2B (10/5-10/9)
Log 3A (10/13-10/16)
Log 3B (10/13-10/16)
Log 4A (10/19-10/23)
Log 4B (10/19-10/23)
Log 5A (10/26-10/30)
Log 5B (10/26-10/30)
►
November
(8)
►
December
(7)
►
2010
(39)
►
January
(11)
►
February
(7)
►
March
(9)
►
April
(7)
►
May
(3)
►
June
(2)
No comments:
Post a Comment