Wednesday, December 23, 2009

Log 13B (12/21-12/23)

It is the end of this short two day week and our developmental work has not been collected which is a good thing because all of the work needed to be handed in was not feasible. Today was a very productive work day with my site plan. I have the plan of procedures completed but need to scan the charts on my blog when I am back in school because I do not own a scanner.

Log 13A (12/21-12/23)

It's the beginning of a new week and I will be finishing up my developmental work.

Friday, December 18, 2009

Log 12B (12/14-12/18)

It is the end of another week here in the Green Marina project and I have almost completed the plan of procedures part of the developmental work, which is due next tuesday (12/22). We have just received accurate dimensions in class today so now I am able to begin work on the othrographic, isometric and 3D AutoCAD drawings.

Monday, December 14, 2009

Log 12A (12/14-12/18)

It is the beginning of a new week and the dimension situation is still not resolved. The developmental work is due on the 22nd so as of now I am going to concentrate on getting everything else besides the drawings done. Once the dimension situation is solved, I will be able to complete the aerial plan view, elevations of outer limit drawing, cross-section and 3D drawing. But until then, the drawings that will be done on AutoCAD will not be complete. This goes for all the other green marina students.

Friday, December 11, 2009

Log 11B (12/7-12/11)

It is the end of the week and I have not been able to move forward due to many complications due to various problems with the drawings and site plans given to us. A student who is also working on the green marina project brought in a large aerial photo of the marina. The smaller photos that we were basing our drawings off were to a 1"-120' scale while the aerial photo was based off a 1"-150' scale. In the end our drawings, which were based off the 1"-120' scale, were innaccurate and to be able to use these drawings later on next year, they must be as accurate as possible. This causes us to start our drawings over and all share dimensions of the 1"-150' aerial photo.

Monday, December 7, 2009

Log 11A (12/7-12/11)

It is the beginning of a new week and the goals I have for this week are to complete orthographic drawings and isometric drawings. Also for the developmental work, I must complete supplies and materials lists.

Friday, December 4, 2009

Log 10B (11/30-12/4)

At the end of this week I have completed the bid process with partner, AM. We sent bids to three hobby shops in the NY, PA and NJ area. Materials we requested bids for include Realistic Water, Scenic Cement, and Road Tape. There are several more items and if a bid is received, we will be able to use these items to construct our model.