Friday, December 11, 2009
Log 11B (12/7-12/11)
It is the end of the week and I have not been able to move forward due to many complications due to various problems with the drawings and site plans given to us. A student who is also working on the green marina project brought in a large aerial photo of the marina. The smaller photos that we were basing our drawings off were to a 1"-120' scale while the aerial photo was based off a 1"-150' scale. In the end our drawings, which were based off the 1"-120' scale, were innaccurate and to be able to use these drawings later on next year, they must be as accurate as possible. This causes us to start our drawings over and all share dimensions of the 1"-150' aerial photo.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment